Disconnection of foul drainage from existing private WwTW, construction of a WwPs and rising main to connect to NI Water sewer located to the south of the proposed site (Amended Address)
Planning applicationsDetermined — Granted
Date
2025-04-04
Address
Site directly adjacent 15 Blackwater Heights, The Brae, Ballygowan, BT23 5WY